Meetings / Trial Meeting incomplete
Otago O. & T. Assn @ Oamaru Last updated 22/11/2024 5:08am
Saturday, 7 Sep 2002
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
TBA -
Weather
TBA -
Rail
TBA -
Track
Left hand
1800m -
Straight
350 Metres