Meetings / Trial Meeting incomplete
Riccarton Park - Riccarton Turf @ Rangiora Last updated 28/04/2024 11:15pm
Tuesday, 23 Jun 1998
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Heavy -
Weather
Overcast -
Rail
TBA -
Track
Left hand
1764m -
Straight
250 Metres