Meetings / Trial Meeting incomplete
Riccarton Park - North Canterbury @ Rangiora Last updated 22/11/2024 2:57am
Tuesday, 28 Aug 2001
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Soft 10.28 pm 03/04/22 -
Weather
Fine -
Rail
TBA -
Track
Left hand
1764m -
Straight
250 Metres