Meetings / Trial Meeting incomplete
Riccarton Park - North Canterbury @ Rangiora Last updated 21/01/2025 10:33pm
Tuesday, 24 Jul 2001
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Heavy -
Weather
Showery -
Rail
TBA -
Track
Left hand
1764m -
Straight
250 Metres