Meetings / Trial Meeting incomplete
Matamata RC @ Matamata Last updated 05/12/2025 4:43pm
Thursday, 7 Apr 1994
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Good
-
Weather
Overcast
-
Rail
TBA -
Track
Left hand
1628m -
Straight
300 Metres
