Meetings / Trial Meeting incomplete
Matamata RC @ Matamata Last updated 04/12/2024 7:37am
Tuesday, 8 Apr 1997
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Good -
Weather
Cloudy -
Rail
TBA -
Track
Left hand
1628m -
Straight
300 Metres