Meetings / Trial Meeting incomplete
Manawatu O. & T. Assn @ Foxton Last updated 30/12/2024 4:36am
Tuesday, 3 Sep 1996
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Soft -
Weather
Fine -
Rail
TBA -
Track
Left hand
1811m -
Straight
349 Metres