Meetings / Trial Meeting incomplete
Manawatu O. & T. Assn @ Foxton Last updated 21/11/2024 11:30pm
Tuesday, 3 Sep 2002
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Soft 10.28 pm 03/04/22 -
Weather
Cloudy -
Rail
TBA -
Track
Left hand
1811m -
Straight
349 Metres