Meetings / Trial Meeting incomplete
Manawatu O. & T. Assn @ Foxton Last updated 22/12/2024 3:26am
Tuesday, 4 Sep 2001
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Soft 10.28 pm 03/04/22 -
Weather
Fine -
Rail
TBA -
Track
Left hand
1811m -
Straight
349 Metres