Meetings / Trial Meeting incomplete
Wanganui Racehorse Owners Association Inc @ Foxton Last updated 22/12/2024 6:17pm
Tuesday, 20 Oct 1998
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Heavy -
Weather
Raining -
Rail
TBA -
Track
Left hand
1811m -
Straight
349 Metres