Meetings / Trial Meeting incomplete
Egmont RC @ Hawera Last updated 22/11/2024 2:58am
Thursday, 4 Nov 1993
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Good -
Weather
Fine -
Rail
TBA -
Track
Left hand
1822m -
Straight
350 Metres