Meetings / Trial Meeting incomplete
Whakatane RC @ Te Teko Last updated 06/11/2024 9:13am
Wednesday, 7 Aug 2002
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Soft -
Weather
Fine -
Rail
TBA -
Track
Right hand
1800m -
Straight
420 Metres