Meetings / Trial Meeting incomplete
Whakatane RC @ Te Teko Last updated 04/12/2024 7:42am
Tuesday, 11 Aug 1998
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Heavy -
Weather
Showery -
Rail
TBA -
Track
Right hand
1800m -
Straight
420 Metres