Meetings / Trial Meeting incomplete
Counties RC @ Pukekohe Park Last updated 12/12/2024 5:10am
Friday, 30 May 2003
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Soft -
Weather
Showery -
Rail
TBA -
Track
Right hand
1900m -
Straight
520 Metres