Meetings / Trial Meeting incomplete
Auckland RC @ Ellerslie Last updated 23/11/2024 9:20pm
Tuesday, 6 Dec 1994
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Good -
Weather
Fine -
Rail
TBA -
Track
Right hand
1876m -
Straight
382 Metres